-
36浏览
-
0点赞
-
0收藏
-
0分享
-
88下载
-
0评论
-
引用
期刊论文
Crack growth retardation of single overload for A537 steel in a 3.5% NaCI solution under cathodic potential and free corrosion condition
,-0001,():
Single peak overload retardation of corrosion fatigue crack growth under constant AK control was studied for A537 steel in air and in a 3.5% NaC1 solution at the applied cathodic potential of -1400mV (SCE) and in free corrosion condition. The crack closure behaviour was examined by the speckle interferometry technique at different stages of fatigue crack propagation. Scanning electron microscopy was used to observe the morphologies of fracture surface. The experimental results showed that, in all conditions, overload retardation occurred and the retarded propagation distances of crack were longer than the plastic zone size caused by overload at the crack tip. In air or in 3.5% NaC1 at the cathodic potential, delayed retardation occurred after applying a peak overload, the crack growth consisted of three stages: crack extension due to overload; decelerating in crack growth; and resumption of crack growth rate. Immediate retardation occurred when specimens were tested in a 3.5% NaCl solution in free corrosion conditions. Crack extension due to overload was not observed. Under both cathodic polarization and free corrosion condition, the overload retardation phenomena were not as obvious as that in air. The retarded propagation distance and the retardation degree were both smaller than those in air. The mechanisms for overload retardation of corrosion fatigue crack growth under the control of hydrogen embrittlement and anodic dissolution were discussed on the basis of analyses of crack closure, residual compressive stress and crack tip blunting.
【免责声明】以下全部内容由[李劲]上传于[2009年02月17日 15时44分15秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。
本学者其他成果
同领域成果