深井煤柱长期支承性能与稳定性实测
首发时间:2012-12-13
摘要:为研究条带煤柱的长期承载能力,对岱庄煤矿某条带煤柱进行了长期观测。建立了符合岱庄煤矿条带开采工程实际的条带煤柱稳定状态结构模型,确定了煤柱受力与压力计读数的关系,采用钻孔压力计和自动监测系统对某条带煤柱进行了长期观测。监测表明:煤柱边缘侧最易破坏,距煤柱边缘1m、2m、3m部位的实际最大承载能力分别为6.31MPa、6.96MPa、9.76 MPa,距边缘5m处煤体实际承载能力大于11.90MPa;观测末期煤柱最大承载部位距离煤柱边缘6~8m,70m煤柱中部宽约54m的范围内承载力要稍小些。监测周期内整个煤柱承载呈现出典型的马鞍形,煤柱是稳定的。
关键词: 采矿工程 钻孔压力计 条带煤柱 结构模型 长期实测 承载能力
For information in English, please click here
Measurement on Long-term Bearing Capacity and Stability of Deep Pillar
Abstract:In order to study the long-term bearing capacity of strip pillar, a strip pillar of Daizhuang coal mine was monitored. A strip pillar stability state structure model is established accord with the engineering practice of Daizhuang coal mine, and the relationship between the stress of pillar and manometer reading is determined. The strip pillar was monitored with drilling pressure meter and automatic monitoring system for a long time. Monitoring results show that the edge of pillar can be destroyed easily, the actual maximum bearing capacity of the part which is 1m, 2m, 3m away from the edge is respectively 6.31 MPa, 6.96MPa, 9.76MPa; the actual bearing capacity at the part which is 5m away from the edge is greater than 11.90MPa. In the end of measurement term, the maximum bearing part is 6~8m away from the edge of strip pillar, and the stress of the central part of the 70m-width pillar is smaller. The bearing shape of whole pillar presents as typical saddle, so the pillar can keep stable for a long time.
Keywords: mining engineering drilling manometer strip pillar structure model long-term measurement bearing capacity
基金:
论文图表:
引用
No.****
同行评议
共计0人参与
勘误表
深井煤柱长期支承性能与稳定性实测
评论
全部评论0/1000