编制动车组一级修调车作业计划的启发式算法
首发时间:2013-12-16
摘要:本文主要解决了动车组一级修调车作业计划的计算机智能编制问题。针对动车组一级修调车作业计划问题,分析了其编制要素、约束及目标。通过借鉴和模拟人工编制动车组一级修调车作业计划的经验和方法,设计了一套编制计划的启发式规则,产生一级修调车作业计划的初始方案。为人工编制实际调车作业计划提供了基础方案。最后本文结合上海南动车运用所的案例,说明了动车组一级修调车作业计划设计原理。
For information in English, please click here
Heuristic Algorithm for Making Shunting Scheme of First-level Maintenance for EMUs
Abstract:This paper mainly solves the problem of making shunting scheme of first-level maintenance for EMUs by computer intelligence. For the problem, we firstly analyze the key elements, constraints and goals to make a shunting scheme. Then, by learning and simulating the approach to making a shunting scheme of first-level maintenance for EMUs by hand, we design a heuristic rule for making a shunting scheme, and by which we get the primary solution of shunting scheme of first-level maintenance for EMUs. It provides the basic scheme for making practical shunting scheme. At last, with the case of Shanghai South EMUs Running Shed, we illustrate the theory of making shunting scheme of first-level maintenance for EMUs.
Keywords: Railway Transportation First-level Maintenance for EMUs Shunting Scheme Heuristic Algorithm
论文图表:
引用
No.4573867911310138****
同行评议
共计0人参与
勘误表
编制动车组一级修调车作业计划的启发式算法
评论
全部评论0/1000