基于BIM的装配式建筑敏捷设计管理研究
首发时间:2019-07-02
摘要:现阶段如何提高装配式建筑中设计工作管理效率成为学者们关注的热点问题。本文通过BIM的协同管理,将敏捷项目管理的思想运用到设计工作管理,建立基于BIM的装配式建筑设计敏捷管理运作模型,动态循环式反馈与设计相关得信息,对设计方案进行迭代更新,从流程上优化设计工作,减少时间浪费,提高效率。并以上海市某装配式混凝土建筑项目为例,运用关键线路的对比分析,得出该模型能够帮助项目管理者提高工作管理效率,为敏捷管理思想在装配式建筑中的运用提供参考。
For information in English, please click here
Research on Agile Design Management of Assembly Building Based on BIM
Abstract:At this stage, how to improve the efficiency of design work management in prefabricated buildings has become a hot issue for scholars. Through the collaborative management of BIM, this paper applies the idea of agile project management to design work management, establishes a BIM-based assembly building design agile management operation model, dynamic cyclic feedback and design-related information, and iteratively updates the design plan. Optimize design work on the process to reduce time wastage and improve efficiency. Taking a prefabricated concrete building project in Shanghai as an example, using the comparative analysis of key lines, the model can help project managers improve work management efficiency and provide reference for the application of agile management ideas in prefabricated buildings.
Keywords: Design process optimization agile management BIM fabricated buildings
基金:
引用
No.****
动态公开评议
共计0人参与
勘误表
基于BIM的装配式建筑敏捷设计管理研究
评论
全部评论0/1000