动车组多专业检修调度优化模型与算法研究
首发时间:2019-11-22
摘要:近年来我国高速铁路建设取得了显著的成就,高速铁路营业里程在2018年底已达2.9万公里,动车组保有量逾3000标准组。随着动车组的检修量日益增加,动车所的检修压力越来越大。动车所检修工作由多个专业团队协同完成,其检修任务调度计划具有重要的实际意义。本文针对动车所检修任务调度计划优化编制问题,以满足动车组的开行计划、检修计划和调车计划为约束条件,同时考虑多个专业检修团队的资源约束,以减少无效调度时间为优化目标,构建整数规划数学模型。鉴于模型的复杂性,本文设计了基于最大最小蚁群系统的快速求解策略,为动车所的检修生成组织提供决策支持。
For information in English, please click here
Research on Optimization Model and Algorithm of EMU Multi-Professional Teams Maintenance Task Scheduling
Abstract:In recent years, China's high-speed railway construction has made remarkable achievements. The operating mileage of high-speed railway has reached 29000 kilometers by the end of 2018, and the number of EMUs has exceeded 3000 standard units. With the increasing number of EMU maintenance, the maintenance pressure of EMU depot is increasing. The maintenance work of EMU is completed by many professional teams, and the scheduling of maintenance tasks is of great practical significance. In this paper, aiming at the problem of scheduling optimization of maintenance tasks for EMUs, the constraints were to meet the operation plan, maintenance plan and shunting plan of EMUs, and the resource constraints of multiple professional maintenance teams was considered. The objective was to reduce invalid scheduling time, and to build an integer programming mathematical model. In view of the complexity of the model, this paper designed a fast solution strategy based on the maximum and minimum ant colony system, which provided decision support for the maintenance generation organization of EMU.
Keywords: Transportation Organization EMU Maintenance Scheduling Problem Ant Colony Optimization Algorithm.
引用
No.****
同行评议
勘误表
动车组多专业检修调度优化模型与算法研究
评论
全部评论0/1000