您当前所在位置: 首页 > 学者

李启明

  • 216浏览

  • 0点赞

  • 0收藏

  • 0分享

  • 404下载

  • 0评论

  • 引用

期刊论文

Alternative Concession Model for Build Operate Transfer Contract Projects

李启明L.Y. Shen H. Li and Q.M. Li

,-0001,():

URL:

摘要/描述

This paper develops an alternative concession model for build operate transfer (BOT) infrastructure projects. The concession period is a measure for deciding when the project ownership will be transferred from the investor back to the government concerned; it also demarcates the benefits, authorities, and responsibilities between the government and private investors. Previous studies have developed various techniques and methods, mainly suggesting proper organization structure, contracting procedures, methods of project financing, and risk allocation strategies when BOT-contract projects are implemented. These works have provided effective methodologies for the development of BOT contracts. Nevertheless, it appears that little has been undertaken in studying the way to determine the concession period in a BOT contract. This paper critically reviews the principles of establishing the concession period in a BOT contract. Such a review leads to developing a quantitative model for determining a proper concession period that can protect the interests of both the government concerned and private investors. An example is given that indicates how the alternative model can be applied to determine the concession periods of BOT infrastructure projects.

【免责声明】以下全部内容由[李启明]上传于[2006年12月14日 17时29分44秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。

我要评论

全部评论 0

本学者其他成果

    同领域成果