Delays are among the most phenomena in construction industry, it causes not only the increase of construction cost but also the loss of business income in the future. There are many uncertain factors which increase risks in large-scale construction projects. South-to-North Water Transfer Project is a grand water diversion project which plays a significant part in our country economic development. This paper collected delay factors on the basis of questionnaire feedback from different parts (clients, designers, contractors, and consultants) that related to the project. Based on the data, the paper used principal components analysis method in the factor analysis to simplify variables to several dimensions and find the main factors. We also do further research on the project-related, client-related and contractor-related delay factors respectively. The result indicated that the poor communication, client’s unpractical requirement, delay payment to contractors, inadequate qualification and lack of experience of contractors are important factors; it found that the use of new technology and information should be enhanced; the result also indicated that many delay factors are correlative and precaution measures should be taken to reduce the risks in construction delays.

关键词: South-to-North

【免责声明】以下全部内容由[刘睿]上传于[2007年12月04日 19时15分28秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。

我要评论

全部评论 0

本学者其他成果

    同领域成果