New Method for Calculating Path Float in Program Evaluation and Review Technique (PERT)
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT SEPTEMBER/OCTOBER 2003,-0001,():
The path float use in the network is an effective method used to cope with various uncertainties existing within the construction. However, the current path float calculating method may bring misleading information to the managers on site and then cause project duration risk in the construction. The purpose of this paper is to present a new method, which calculates the noncritical path float in the program evaluation and review technique (PERT), to copy with the uncertainties within the network implementation, and to reduce the misleading information. An example network was analyzed with the new method, the results showed the consistent path float under required completion probability and required duration. The new path float concept will bring useful planning information to the managers and the planners in the construction.
【免责声明】以下全部内容由[钟登华]上传于[2005年01月18日 21时27分51秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。
本学者其他成果
同领域成果