Characterization of the disturbed zone in a large rock excavation for the Three Gorges Project

邓建辉J.H. Deng C.F. Lee and X.R. Ge

Can. Geotech. J. 38: 95-106 (2001),-0001,():

URL:

摘要/描述

Excavation in a rock mass leads to the perturbation of the stress regime, often creating a stress-relieved, locally weakened zone known as the disturbed zone. This paper presents the results of in situ studies that were carried out both in the central rock barrier (or separation block) between the shiplift and the temporary shiplock and in the northern slope of the permanent shiplock of the Three Gorges Project. The vertical extent of the disturbed zone was determined jointly by cross-hole seismic wave penetration testing and borehole elastic modulus testing, and the horizontal extent was assessed by monitoring and evaluating the deformation characteristics. Compared with the undisturbed rock mass, the P-wave velocity of the disturbed zone was reduced by 34–38% and the borehole elastic modulus by 12–31%. The reductions were caused by the opening of primary structural planes or the extension of apertures due to local sliding along the structural planes. In the disturbed zone, no newly formed fractured planes were found. The observed disturbed zone was compared with the tensile stress zones and the shear-damaged zones calculated by the finite element method. A rock reinforcement scheme was recommended and implemented.

【免责声明】以下全部内容由[邓建辉]上传于[2006年11月18日 02时31分47秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。

我要评论

全部评论 0

本学者其他成果

    同领域成果