您当前所在位置: 首页 > 学者

郭保华

  • 36浏览

  • 0点赞

  • 0收藏

  • 0分享

  • 40下载

  • 0评论

  • 引用

期刊论文

底鼓型突水过程数值分析

郭保华GUO Bao-hua

J0URNAL 0F C0AL SCIENCE& ENGINEERING ,-0001,():

URL:

摘要/描述

TO investigate the water-inrush process due to floor heave,simulation mode1 was made and factors of mining height,immediate roof strength,water pressure,depth and strength of confiningbed,excavation step distance and bury depth were analyzed by using UDEC software.Five zones theory(containing two maximum main stress circles and three maximum main stress stratiform zones)along excavation direction was proposed, and two ends-fixed beam mechanical model in maximum main stress circle was established.It is found that water inrush always occurs at the end of the beam where shear stress is higher, that is to say it always occurs at near the starting cut and working face。 Water pressure,height and strength of confiningbed are the determined factors,and mining height,immediate roof strength。excavation step distance and bury depth effect water inrush process due to floor heave.

【免责声明】以下全部内容由[郭保华]上传于[2013年05月16日 23时40分14秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。

我要评论

全部评论 0

本学者其他成果

    同领域成果