Aggregate line capacity design for PWB assembly systems

华中生ZHONGSHENG HUA † and PRASHANT BANERJEE ‡*

INT. J. PROD. RES., 2000, VOL. 38, NO.11, 2417-2441,-0001,():

URL:

摘要/描述

In a multi-product, flexible manufacturing environment, line capacity of printed wiring board (PWB) assembly systems may need to be adjusted at the beginning of each aggregate planning period because of demand fluctuation over multiple periods. A model of production planning and equipment changeover scheduling at the aggregate level is developed. In the described model, three kinds of equipment changeover methods, i.e. adding machine, removing machine and transferring machine, are involved. Because the model is a large-scale integer programming problem, it cannot be solved directly. A solution approach is developed, which first solves a recursive linear programming problem to obtain a rough set of machines to be added and a rough set of machines to be removed for each machine line in each period, then applies a branch and bound heuristic to the rough sets to obtain near-optimal solutions to the equipment changeover scheduling problem. Computational studies show the financial benefit both on capital cost and equipment changeover costs.

关键词:

【免责声明】以下全部内容由[华中生]上传于[2005年04月11日 19时16分25秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。

我要评论

全部评论 0

本学者其他成果

    同领域成果