您当前所在位置: 首页 > 学者

周惠忠

  • 31浏览

  • 0点赞

  • 0收藏

  • 0分享

  • 37下载

  • 0评论

  • 引用

期刊论文

Design and verification test of the small absorber ball system of the HTR-10

周惠忠H.Z.Zhou* Z.Y.Huang X.Z.Diao

H.Z. Zhou et al./Nuclear Enggineering and Design 218(2002)155-162,-0001,():

URL:

摘要/描述

A small absorbmr ball system is the second shutdown system of the 10 MW High Temperature Gas-cooled Reactor-Test Module. When the control rod system is out of operation. the small absorber ball system is required to emergently shut down the reactor by means of boron carbide balls totally dropping into channels in the side reflector by gravity. Before the reactor re-operates, these small absorber balls must be conveyed from channels in the side refector back to the ball storage vessels below the head of reactor pressure vessel by a pneumatic conveying process. Detailed design of the small absorber ball system was caMed out. and all the components were manufactured. In order to check the performances of the smalI absorber ball system. a pneumatic conveying experiment and a hot test were carried out in the laboratory, and also a pre-operation of the small absorber ball system was verified on the reactor site at room temperature. Test data of the sma]I absorber ball system show that all the parameters, including time of ball dropping, time of ball conveying back, indication of ball level in the ball storage vessel. gas flowrate. and valve operation states. are acceptable and reasonable. The small absorber ball system has been shown to be capable Of performing satisfactorlly at operating temperattures of the reactor.

关键词:

【免责声明】以下全部内容由[周惠忠]上传于[2006年07月05日 01时52分00秒],版权归原创者所有。本文仅代表作者本人观点,与本网站无关。本网站对文中陈述、观点判断保持中立,不对所包含内容的准确性、可靠性或完整性提供任何明示或暗示的保证。请读者仅作参考,并请自行承担全部责任。

我要评论

全部评论 0

本学者其他成果

    同领域成果