您当前所在位置: 首页 > 学者
在线提示

恭喜!关注成功

在线提示

确认取消关注该学者?

邀请同行关闭

只需输入对方姓名和电子邮箱,就可以邀请你的同行加入中国科技论文在线。

真实姓名:

电子邮件:

尊敬的

我诚挚的邀请你加入中国科技论文在线,点击

链接,进入网站进行注册。

添加个性化留言

已为您找到该学者20条结果 成果回收站

上传时间

2006年07月25日

【期刊论文】Minimum Deviation Algorithm for Two-Stage No-Wait Flowshops with Parallel Machines*

谢金星, JINXING XIE, WENXUN XING, ZHIXIN LIU AND JIEFANG DONG

,-0001,():

-1年11月30日

摘要

The scheduling problems studied in this paper concern the two-stage no-wait flowshops with parallel machines under the objective function of the minimization of the maximum completion time. A new heuristic algorithm, i.e. the minimum deviation algorithm, is developed to solve the problems. In order to evaluate the average case performance of the algorithm, we design numerical experiments to compare the effectiveness of the algorithm with that of the other approximation algorithms. Extensive simulations are conducted under different shop conditions, and the results statistically show that the minimum deviation algorithm performs well under most of the situations.

Scheduling,, No-wait,, Flowshop,, Parallel machine,, Heuristic

上传时间

2008年02月18日

上传时间

2006年07月25日

【期刊论文】Freezing the master production schedule under single resource constraint and demand uncertainty

谢金星, Jinxing Xiea, Xiande Zhaob, *, T.S. Leeb

Int. J. Production Economics 83(2003)65-84,-0001,():

-1年11月30日

摘要

This paper investigates the impact of freezing the master production schedule (MPS) in multi-item single-level systems with a single resource constraint under demand uncertainty. It also examines the impact of environmental factors on the selection of MPS freezing parameters. A computer model is built to simulate master production scheduling activities in a multi-item system under a rolling time horizon. The result of the study shows that the parameters for freezing the MPS have a significant impact on total cost, schedule instability and the service level of the system. Furthermore, the selection of freezing parameters is also significantly influenced by some environmental factors such as capacity tightness and cost structure. While some findings concerning the performance of MPS freezing parameters without capacity constraints can be generalised to the case of limited capacity, other conclusions under capacity constraints are different from those without capacity constraints.

Master production scheduling, Capacitated lot sizing, Schedule instability, Computer simulation

上传时间

2008年02月18日

上传时间

2008年02月18日

合作学者

  • 谢金星 邀请

    清华大学,北京

    尚未开通主页