您当前所在位置: 首页 > 学者
在线提示

恭喜!关注成功

在线提示

确认取消关注该学者?

邀请同行关闭

只需输入对方姓名和电子邮箱,就可以邀请你的同行加入中国科技论文在线。

真实姓名:

电子邮件:

尊敬的

我诚挚的邀请你加入中国科技论文在线,点击

链接,进入网站进行注册。

添加个性化留言

已为您找到该学者20条结果 成果回收站

上传时间

2006年07月25日

【期刊论文】An intelligent hybrid system for customer requirements analysis and product attribute targets determination

谢金星, R. Y. K. FUNG†*, K. POPPLEWELL‡ and J. XIE§

INT. J. PROD. RES., 1998, VOL. 36, NO.1, 13-34,-0001,():

-1年11月30日

摘要

Aligning its quality initiatives in synchronization with the customer's perception of values is one of the key management strategies for improving the competitive edge of an organization. Therefore, it will be a distinct advantage if one can succeed in effectively capturing the genuine and major customer attributes (requirements), systematically analysing and duly transforming them into the appropriate product attributes (features). This paper puts forward a novel approach for analysing customer attributes and projecting them into the relevant design, engineering and product attributes in order to facilitate decision-making and to guide downstream manufacturing planning and control activities. The proposed hybrid system incorporates the principles of quality function deployment, analytic hierarchy process and fuzzy set theory to tackle the complex and often imprecise problem domain encountered in customer requirement management. It offers an analytical and intelligent tool for decoding, prioritizing and inferring the qualitative, sometimes vague and imprecise Voice of Customer. As a result, the appropriate product attributes can be mapped out and their relevant design targets can be determined quantitatively and consistently. The software supporting the hybrid system is constructed within a generic framework which can be easily customized and configured into specific enterprise models capable of offering more timely responses to the dynamic market demand.

上传时间

2006年07月25日

【期刊论文】Anote on "Cooperative advertising, game theory and manufacturer-retailer supply chains"

谢金星, Jinxing Xie∗, Song Ai

Omega 34(2006)501-504,-0001,():

-1年11月30日

摘要

This note extends the results in the manufacturer-dominated game model of the paper by Li et al. (Omega 30 (2002) 347) to the case where the manufacturer's marginal profit is not large enough. In such situations, the profit of the entire supply chain under the co-op advertising mode is higher than the one under the Stackelberg game, which is consistent with the results of the original paper. However, the advertising expenditures of the manufacturer and the retailer under the co-op advertising model are not always larger than those under the Stackelberg game, which is different from the results of the original paper. Furthermore, the results are also compared with the simultaneous move game of the paper by Huang and Li (Eur. J. Oper. Res. 135 (2001) 527). The manufacturer always prefers the leader-follower structure rather than the simultaneous move structure, which is consistent with the results of the original paper. However, the retailer always prefers the simultaneous move structure rather than the leader–follower structure, which differs from the results of the original paper.

Cooperative advertising, Supply chains, Leader-follower relationship, Pareto efficiencies

上传时间

2006年07月25日

【期刊论文】Minimum Deviation Algorithm for Two-Stage No-Wait Flowshops with Parallel Machines*

谢金星, JINXING XIE, WENXUN XING, ZHIXIN LIU AND JIEFANG DONG

,-0001,():

-1年11月30日

摘要

The scheduling problems studied in this paper concern the two-stage no-wait flowshops with parallel machines under the objective function of the minimization of the maximum completion time. A new heuristic algorithm, i.e. the minimum deviation algorithm, is developed to solve the problems. In order to evaluate the average case performance of the algorithm, we design numerical experiments to compare the effectiveness of the algorithm with that of the other approximation algorithms. Extensive simulations are conducted under different shop conditions, and the results statistically show that the minimum deviation algorithm performs well under most of the situations.

Scheduling,, No-wait,, Flowshop,, Parallel machine,, Heuristic

上传时间

2006年07月25日

【期刊论文】Heuristic Genetic Algorithms for General Capacitated Lot-Sizing Problems

谢金星, JINXING XIE* AND JIEFANG DONG

,-0001,():

-1年11月30日

摘要

The lot-sizing problems address the issue of determining the production lot-sizes of various items appearing in consecutive production stages over a given finite planning horizon. In general capacitated lot-sizing problems, the product structure can be a general acyclic network, the capacity constraints can be very sophisticated, and all the known parameters can be time-varying. This paper proposes heuristic genetic algorithms for these problems by designing a domain-specific encoding scheme for the lot-sizes and by providing a heuristic shifting procedure as the decoding schedule. The main contribution of these genetic algorithms is the presentation technique that encodes only the binary variables for the setup patterns but derives other decision variables by making use of the problem-specific knowledge. Some results from the computational experiments are also given.

Production planning,, Inventory control,, Capacitated lot-sizing,, Genetic algorithm (, GA), ,, Heuristics.,

上传时间

2006年07月25日

【期刊论文】BRANCH AND BOUND ALGORITHM FOR FLEXIBLE FLOWSHOP WITH LIMITED MACHINE AVAILABILITY*

谢金星, XIJUN WANG AND JINXING XIE†

Computers and Mathematics with Applications 44(2002)263-276,-0001,():

-1年11月30日

摘要

Machines may not be available all the time due to uncertain breakdown or preventive maintenance activities. In this paper we develop a branch and bound algorithm to solve the flexible flowshop scheduling problems with non-resumable availability constraint. Both the machine-based and job-based lower bounds are developed by making use of the lower bounds of the classical flexible fowshop problems. Numerical experiments are conducted and the results show that the branch and bound algorithm is effective when the problem size is not very large.

flexible flowshop,, scheduling,, limited availability,, branch and bound

合作学者

  • 谢金星 邀请

    清华大学,北京

    尚未开通主页